1、地板铺装应在地面隐蔽工程、吊顶工程、墙面工程、水电工程完成并验收后进行。
1, floor pavement should be concealed in the ground works, ceiling works, wall works, hydropower projects completed and accepted after.
2、安装现场无交叉施工现象,且无特殊施工限制。
2, the installation site without cross construction phenomenon, and no special construction restrictions.
3、对地面的要求:干净(无明显施工废弃物等)、干燥(指地面湿度要小于20%,不可有潮湿或渗漏处)、平整(在2M靠尺检测地面平整度,靠尺与地面的最大弦高应≤3mm)、牢固(地面基础强度和厚度应符合房屋验收规定)。
3, requirements on the ground: clean (no construction waste), dry (of the ground humidity should be less than 20%, can not have damp or leakage), flat (at 2M on foot to detect ground roughness, the maximum height on the ruler and the ground should be equal to or less than 3mm), strong (ground strength and thickness housing acceptance shall comply with the provisions).
4、边角预留高度:防潮薄膜(或珍珠棉)1mm,地板高度12mm,共计13mm,可根据木塑地板与其它地面的接触部分高于地板成品高度进行适当预留,尤其是门套、墙角、暖气罩及其他不规则细节,也应进行处理。
4, corner reserved height: moisture-proof film (or pearl cotton) 1mm, floor height 12mm, total 13mm, according to the contact part of wood flooring and other ground floor height of product are properly set aside, especially the door, wall, heating cover and other irregular details should also be processed.
5、隔段问题:锁扣式室内木塑地板连续铺设最长为7--8米,长于此距离就要加压条进行隔断。
5, paragraph questions: lock type indoor wood flooring, continuous laying of the longest 7--8 meters, longer than this distance, it is necessary to use layering to partition.
6、损耗:地板的损耗根据房间大小、形状、有没有异型(如地台、隔断等)等而异,一般来说,房间方正、大的损耗小,总的来说低于5%,一般为3---5%,个别异形结构的损耗有可能超过5%。
6, loss: the loss of floor according to the room size, shape, there is no special (such as platform, partition and so on) and so on, in general, the loss of the room Founder, big and small, generally less than 5%, generally 3---5%, the loss of individual shaped structure may be more than 5%.